Floor sanding, floor repairs, gap filling of parquet flooring (Junckers) in Westminster
Before the works...
The merbau parquet flooring in this Westminster office was overall looking tired and in urgent need of renovation. During our initial survey, we did detailed inspection of the floors and discussed with the client all possible options.
Our client has decided to go for floor sanding, floor repairs, gap filling, of 90 sqm merbau parquet flooring and finishing the floors in matt Lacquer.
How we completed the restoration works...
Our floor renovation service begins with detailed inspection of the floors and any repairs to the parquet flooring will be completed in this initial stage. In this project approx. we have repaired approx. 2 sqm of parquet flooring.
Parquet flooring renovation requires many years of experience, skills and the right restoration equipment. Depending on the overall condition of the floors, the initial parquet floor sanding may start with coarser or medium grid. The purpose of this stage is not only to remove the previous finish and get the floors to bare wood, but also to provide a smooth level throughout the entire floor. Some older parquet floors may require more thorough work at this stage.
Next stage in the process of floor renovation was the application of the gap filling. We aim to apply the resin filler with saw dust in late hours of the working day, so it settles properly overnight and in case it is needed we can repeat it on the following morning , if required. The filler is after that removed by next step of the finishing process with medium grids .
Sanding the floors with fine grids (80 - 120 gr) and a good rotary buff to the merbau timber surface with high grid buffing screens is the most important stage in the preparation of the wooden flooring for finishing.
The parquet flooring was consequently sealed with 1 coat of primer and 2 coats of Junckers HP500 Lacquer in matt sheen with another light screen buff between the coats, for an excellent final touch to the finish.